Marine & Transportation

Ships, vessels, ports, airports, marine infrastructure

Erstaunlicher Intl – Harmonic Compliance for Nine Panamax Bulk Carriers: CSL Group and the Great Lakes Seaway

Nine Panamax bulk carriers in the CSL Great Lakes Seaway fleet were found non-compliant with Lloyd’s Register harmonic requirements during routine inspection. VFD-driven loads on each vessel were generating harmonic currents exceeding the limits. Mirus Lineator filters brought all nine vessels into compliance — documented with before/after measurements on representative vessels.

Erstaunlicher Intl – Marine Duty Harmonic Mitigation Saves an Offshore Service Vessel Program

An offshore service vessel DC drive system produced voltage notching severe enough to cause control system malfunctions on other vessel systems. The vessel program was at risk of cancellation. A Mirus Lineator filter on the DC drive eliminated the notching — restoring compatibility between the drive and the vessel’s sensitive electronics. Documented with oscilloscope waveforms before and after.

Glatt Segeln für Kreuzfahrtschiff-Terminal (Zuverlässige Power Inc.)

The Marco Polo Cruise Terminal in Saint John required emergency lighting that met new fire and life safety codes for 190,000 annual passengers. An emergency lighting inverter was specified as part of the essential services infrastructure — the case covers selection, integration, and reliability requirements for port terminal power systems.

Zuverlässige Energieforschung hält über Wasser (Zuverlässige Power Inc.)

Canada’s oldest marine biological station at St. Andrews, NB, pumps seawater with two 100 HP pumps — whose speed and flow rate are controlled by variable frequency drives sensitive to supply quality. The case examines VFD-based pump control and power reliability requirements for continuous marine research operations.

Zuverlässige Energie hält Goose Bay fliegen (Zuverlässige Power Inc.)

Canadian Forces Base Goose Bay — a NATO training facility and alternate space shuttle emergency landing site — updated aircraft ground support power systems in Hangars 7 und 8. The case covers power quality and reliability requirements for military aviation infrastructure with no tolerance for downtime.

Zuverlässige Leistung hält Flughafen Online (Zuverlässige Power Inc.)

Halifax Stanfield International Airport required a 125 Vdc station battery and charger as part of a continuous substation upgrade. The case examines battery backup specifications for airport substation operation — a critical infrastructure application where DC supply reliability directly affects all protective relaying.

Scrollen Sie nach oben